Application
New masonry surfaces must be allowed to cure completely. It is recommended to allow 28 days as the curing time for new masonry surfaces. It is recommended to apply 1 coat of Chennai paints Exterior wall primer and allow it to dry 6-8 hrs before applying top coat. It is not advisable to add more than 1 litre of water in 1 litre of this product, depending on absorption property of the surface. Ensure that surface is completely free from all dirt, loosely held plaster, powdery residue, oil, grease or any other contamination. Any previous growth of fungus, algae or moss needs to be removed thoroughly by vigorous wire brushing and cleaning with water. One coat of Chennai Paints –Bio wash is recommended to prevent further growth of algae, fungus or moss.